Hypotheses · Open · Decides 31 Dec 2028 · Do the halls switch on without the letter?
A campus names the watt or is refused
A named Irish campus discloses a live interconnect, or a named refusal, by 31 Dec 2028.
- Resolves by
- 31 Dec 2028
- Confirm
- Ask for the letter from the grid. Then talk about tax.
- Kill
- A speech, not a notice.
Grade
Open. Resolves by 31 Dec 2028. Blocked: series not wired; grades by the published desk rule when the source publishes.