The Claims · Open · 553 sessions to 31 Dec · A GPU rack makes heat that still needs a 2.3 megawatt cabinet, a transformer, and grain-oriented electrical steel.
The kilogram gets an NDA
A Phase 3 lean-mass preservation program (named antimyostatin or activin antibody plus an incretin) has an NDA or a pre-announced filing date by 31 Dec 2028.
- Resolves by
- 31 Dec 2028
- Confirm
- The leftover became a product.
- Kill
- A Nature letter.
Grade
Open. Grades from the stated sources when the window ends.