Hypotheses · Open · Decides 30 Mar 2028 · A satellite phone is not a dish
Amazon hits the halfway plane or the penalty lifts
Amazon reaches 1,618 operational Leo sats, or the FCC lifts the post-30-Jul-2026 Ka/Ku priority penalty, by 30 Mar 2028.
- Resolves by
- 30 Mar 2028
- Confirm
- The 2026 miss was a delay.
- Kill
- The 2020 licence was a wish.
Grade
Open. Resolves by 30 Mar 2028. Blocked: series not wired; grades by the published desk rule when the source publishes.