The Claims · Open · 803 sessions to 31 Dec · A GPU rack makes heat that still needs a 2.3 megawatt cabinet, a transformer, and grain-oriented electrical steel.
South Boston ships a nameplate
A named large-power transformer from Hitachi’s South Boston expansion is disclosed by Hitachi or a customer by 31 Dec 2029.
- Resolves by
- 31 Dec 2029
- Confirm
- The crane hall shipped.
- Kill
- A rendering with a rail spur.
Grade
Open. Grades from the stated sources when the window ends.