Scanner / POR
POR
WATCH◆ EARNINGS · 11dPortland General Electric Company · Industrials
51COMPOSITE / 100
52.51 −1.0% 5D · RSI 55 · 0.5× vol · ATR 1.9%
Price · 6M · engine levels/api/engine/history?ticker=POR
loading bars…
Signal engine · 8 components
RSI55
MACD48
SQUEEZE79
ATR23
CMF56
VOLUME19
MOMENTUM42
REL STR50
R:R model
- R:R
- 1.0:1
- ATR (risk unit)
- 1.9%
- MACD
- −hist
- Volume vs 20-day
- 0.5×
- Verdict
- WATCH
Stops and targets are measured in ATR so a 2% wobble in a sleepy utility and a 2% wobble in a biotech are never mistaken for the same thing.
Gate-clear alert
Register for POR — we store the intent now; delivery opens with private desk. No spam list.