The Claims
19 October · London & New York
Each one sits on a thesis. The date is when it gets graded. They are not calls.

Thesis
Ships wait because Gatun is the tank, and a dry year is a draft notice
Does the canal have enough water?
Resolved
19 October · London & New York
Each one sits on a thesis. The date is when it gets graded. They are not calls.

Thesis
Does the canal have enough water?
Resolved